Work has started in preparing FFR #85 for NASA 25 Hr Enduro

First Prep Session Complete and #85 Ready to go Back Into Trailer

Session 1 Items which were worked on

  • Rear Chassis Modifications – Moved round crossmember forward to allow more space for new fuel cell. Added square tubing similar to what is in MKIII. Added support for 3 Link items.

  • Suspension Parts – Replaced all shocks and springs, Replaced Panhard Bar and Rear Upper Control arm. Replaced Rear Lower Control Arm Rod Ends.

  • Radiator – Replaced radiator with an aluminum one. Rework radiator support for new radiator.

  • Engine – Removed engine and started assembly of new engine, BOSS 302 – 363 cu.in..

  • Pictures are in the “Photos” link above.